Installation:
1. Clean the surface you intend to stick the light strip to Unroll the foam tape.
2. Press and hold the foam tape firmly against the surface.
3. Wait for 24 hours.
4. Remove the protective tape from the strip.
5. Press and hold your LED light strip firmly against the foam tape.
Your LED light strip is now installed.
Widely Application
Suitable for building operations, the processing and assembly of electronic and digital products, home appliance or office decoration, etc.
Double-Sided Foam Tape is perfect for outdoor installations or any other difficult to mount surfaces such as stone, concrete, unfinished wood.
Any time an LED lights strip will installed upside down or on an overhead surface.
Removable Tape
The mounting tape is eary to remove.You can remove slowly when you don't need it, It does not leave sticky residue and does not peel off the surface coating.