All positive, negative and grounding buses installed, fully pre-wired
Panels with meters include toggle switch for mounting up to 3 battery banks
All hot, neutral and safety ground buses installed, fully pre-wired
All circuit label positions are backlit on standard panels - No kit required
Description
All positive, negative and grounding buses installed, fully pre-wired Panels with meters include toggle switch for mounting up to 3 battery banks All hot, neutral and safety ground buses installed, fully pre-wired.