Usage:
Clean up the substrate: the substrate surface must be dry and clean, no dust, no oil, prohibited in the wet substrate surface construction.
Construction: the product will be installed after the glue mouth, rotate the cap, deep into the bottom of the construction gap will be injected into the gel to fill the construction, construction of 24 hours to prohibit water, it is recommended that the construction of the depth of the gap is less than 2cm is preferred.
Temperature Note: Recommended construction temperature 5-35 ℃, winter, please choose the noon or afternoon construction; use the temperature of -40 ℃ to 80 ℃, beyond this temperature range to use the product performance will be affected.
Specification:
Capacity: 500g / 1pc
color: gray
Shelf life:3 Years
Storage:Store in a cool, dry place
Package includes
1 pcs * Slab Concrete Crack Repair Sealer
1pcs * scraper
1pcs * glove
1pcs * Glue nozzle
Notes:
1.Please use as soon as possible after opening the bag, Avoid product curing, using the weather temperature has an impact on the curing time, curing time becomes longer in winter is a normal phenomenon, the product at room temperature fully cured time of about 24 hours.
2.Inadvertently fall on the clothing need to be cleaned immediately, the construction process pay attention to clothing preservation.
3.Sealed and stored in a low-temperature dry place, it is recommended to be stored in the temperature 5-25 ℃.
4.Products can not be used for wet substrate construction, construction to ensure that the substrate is clean, dry, no dust.